{"id":2413,"date":"2024-06-05T12:17:06","date_gmt":"2024-06-05T12:17:06","guid":{"rendered":"https:\/\/electromech.staging2.amura.in\/in\/?post_type=case-study&#038;p=2413"},"modified":"2026-10-09T06:32:31","modified_gmt":"2026-10-09T06:32:31","slug":"precast-sector-2","status":"publish","type":"case-study","link":"https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/","title":{"rendered":"Precast Sector"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/electromech.staging2.amura.in\/in\/case-study\/stacker-cranes-for-optimal-and-efficient-handling-in-the-pharma-sector\" target=\"_blank\" rel=\"noreferrer noopener\"><\/a><\/p>\n\n\n\n<section class=\"wp-block-custom-case-study case-study\"><div class=\"case-study-banner-wrapper\"><div class=\"container\"><h1 class=\"case-study-banner__main-title\">Gantry cranes for efficient handling of infrastructure projects<\/h1><\/div><div class=\"case-study-banner\"><div class=\"container wrapper_banner\"><div class=\"case-study-banner__box\"><h2 class=\"case-study-banner__box-subtitle\">WE ARE YOUR SOLUTION<\/h2><div class=\"case-study-banner__box-desc\"><p>Read how Gammon, one of the\nlargest construction and infrastructure\ngiants was able to reuse their existing ElectroMech cranes to build one of the longest flyovers in Pune.<\/p><\/div><\/div><div class=\"case-study-banner__image\"><img decoding=\"async\" loading=\"lazy\" width=\"700\" height=\"341\" src=\"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/image1-8.jpg\" alt=\"Gantry cranes for efficient handling of infrastructure projects\"\/><\/div><\/div><\/div><\/div><div class=\"case-study-overview-image\"><div class=\"container\"><img decoding=\"async\" loading=\"lazy\" width=\"1600\" height=\"827\" src=\"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/patch-bg-9.png\" alt=\"\"\/><\/div><\/div><div class=\"case-study-overview\"><div class=\"overview-block has-bg\" style=\"background-color:#ebebeb\"><div class=\"container\"><h2>About Gammon India Ltd.<\/h2><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><p>Gammon India is amongst the largest construction and infrastructure companies in India. It has created landmark structures right from the Gateway of India in 1911 to India\u2019s longest river bridge at Patna. Gammon was awarded with a contract to build an 11.2 km, Kalewadi to Dehu-Alandi Bus Rapid Transit System (BRTS) corridor in Pune. The flyover near Empire Estate in Chinchwad, part of this project, is one of the longest flyovers in Pune with a total length of 1.9 km. The entire flyover has been constructed using precast segments.<\/p>\n<h3>Handling solutions from ElectroMech are undoubtedly the first choice of several leading infrastructure giants because of our domain expertise and the long-term reliability of our cranes.<\/h3><\/div><\/div><\/div><\/div><div class=\"overview-block image-only has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><div class=\"overview-block__vertical\"><div class=\"overview-images-grid items-2\"><div class=\"overview-image-item\"><img decoding=\"async\" loading=\"lazy\" width=\"1600\" height=\"721\" src=\"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/image3-2.jpg\" alt=\"\"\/><\/div><div class=\"overview-image-item\"><img decoding=\"async\" loading=\"lazy\" width=\"1602\" height=\"830\" src=\"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/handling-4.jpg\" alt=\"\"\/><\/div><\/div><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><h2>The handling challenges at the Empire Estate flyover project faced by Gammon<\/h2><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><p>Since Gammon planned to construct this flyover using\n          precast segments, they set up a casting yard at a nearby\n          location in Chinchwad. For this project, handling\n          requirements existed at two places. First, at the segment\n          casting yard, and the other, at the actual site of the flyover, to\n          lift and place the precast segments on the pillars. At both\n          places, cranes were expected to handle heavy and bulky\n          loads, while performing round the clock. It was essential to\n          match the speed of production of precast segments and the construction of the flyover in order to meet the stipulated\n          deadlines of the project. This requirement also obviously\n          meant the synchronisation of handling capacities and speeds\n          of cranes at both the locations. <\/p>\n<p>Gammon intended to check the possibility of reusing existing\n          cranes which were used on its earlier projects, with the\n          intention of reducing project cost and procurement time for\n          new cranes. <\/p><\/div><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ebebeb\"><div class=\"container\"><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><p>Careful evaluation of existing cranes, systematic assessment of new requirements and perfect project planning in order to reuse existing ElectroMech cranes helped Gammon in saving substantial costs and reducing project implementation time.<\/p>\n\n<h2>Solutions from ElectroMech<\/h2>\n\n<p>The ElectroMech project team together with the engineers from Cranedge \u2013 our service subsidiary &#8211; carefully studied the new requirements and analysed the condition of the existing cranes available with Gammon. After this elaborate exercise, we narrowed down the selection to 3 existing cranes which would be able to meet the new requirements with alterations and refurbishing.<\/p>\n\n<p>Two Gantry cranes were planned for the segment casting yard. They were to cover the entire casting yard process, which includes positioning the moulds for the manufacture of precast structures, pouring concrete into the prefabricated steel moulds and finally, placing the finished precast segments on the despatch trucks. The first crane was a 60\/12MT, 19.5m span gantry crane with 15m height of lift. This was used to handle the heavy moulds and finished products. The second crane was a 15MT gantry crane with a 19.5m span and 12m height of lift. This was mainly used for handling the supporting structures during manufacture of precast structures.<\/p>\n\n<p>The third crane was planned at the construction site of the main flyover. This was a 60\/12MT gantry crane with 28m span and 15m height of lift to be used to build the first phase of the flyover. The crane traversed along the length of the entire path of the flyover, lifting precast segments from the truck and placing them on the pillars. Precision positioning of the precast segments was made possible by using VFD drive controls that enable a high level of accuracy. This crane was also provided with a 12 MT auxiliary hoist which was used to install and dismantle all the supporting structures for the flyover as well as the concrete structures.<\/p><\/div><\/div><\/div><\/div><div class=\"overview-block image-only has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><div class=\"overview-block__vertical\"><img decoding=\"async\" loading=\"lazy\" width=\"1602\" height=\"830\" src=\"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/solution-4.jpg\" alt=\"\"\/><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><h2>ElectroMech Cranes &#8211; Cost-efficient solutions<\/h2><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><p>For construction companies, it is the norm to write off the\n        cost of their capital equipment such as cranes in a single\n        project. This, of course directly affects the profitability of the\n        project. Conversely, being able to reuse their cranes for\n        another project offers a huge advantage in terms of\n        profitability, a scenario that several of ElectroMech\u2019s\n        construction clients have been able to benefit from.\n        ElectroMech cranes have proven themselves to be rugged,\n        reliable and long-lasting. Several EPC companies use them\n        over the years on a number of projects \u2013 one after the other.\n        Admirably, we have reconfigured and modified ElectroMech cranes for several of our clients prior to shifting them to their new project site to ensure optimal performance. <\/p>\n<p>For this project too, Gammon reused ElectroMech cranes\n        originally supplied to them 2009 for the construction of a\n        bridge over the Godavari river. Through careful evaluation of\n        the existing cranes and assessment of new requirements\n        based on our previous experience on similar projects, we\n        were able to help Gammon reuse these assets. This helped\n        Gammon to substantially reduce project cost and\n        turnaround time of the project. <\/p>\n<h3>In order to control the project costs, EPC companies expect that the assets be used for several projects. ElectroMech cranes are being repetitively used by EPC companies on multiple projects. <\/h3><\/div><\/div><\/div><\/div><div class=\"overview-block image-only has-bg\" style=\"background-color:#ebebeb\"><div class=\"container\"><div class=\"overview-block__vertical\"><img decoding=\"async\" loading=\"lazy\" width=\"1170\" height=\"567\" src=\"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/table-9.jpg\" alt=\"\"\/><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><h2>How Gammon benefited from ElectroMech solutions<\/h2><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><ul>\n            <li>Cost saving through reuse of previously supplied cranes<\/li>\n            <li>Considerable time saved in designing and procuring new cranes <\/li>\n          <\/ul><\/div><\/div><\/div><\/div><\/div><div class=\"case-study-cs\" style=\"background-image:url(https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/challenge-bg-7.jpg);background-size:cover;background-position:center\"><div class=\"container\"><div class=\"case-study-cs__grid\"><div class=\"case-study-cs__col case-study-cs__challenges\"><h3>Challenges<\/h3><ul><li>Handling of heavy and bulky precast segments<\/li><li>Ensuring round the clock working<\/li><li>Designing a handling solution to synchronise speeds of production and construction<\/li><li>Reusing existing cranes to save project cost and time<\/li><\/ul><\/div><div class=\"case-study-cs__col case-study-cs__solutions\"><h3>Solution<\/h3><ul><li>Heavy duty yet sleek cranes capable of lifting heavy loads<\/li><li>Carefully planned material handling system of 3 cranestwo at the segment casting yard and one at the construction site<\/li><li>Gantry cranes previously supplied to Gammon for the Godavari bridge project were used<\/li><\/ul><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"featured_media":2441,"template":"","categories":[],"class_list":["post-2413","case-study","type-case-study","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gantry Cranes for Infrastructure Handling | ElectroMech<\/title>\n<meta name=\"description\" content=\"ElectroMech EOT cranes support renewable energy projects, enabling safe, precise handling of heavy components in wind, solar and hydro power plant environments.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gantry Cranes for Infrastructure Handling | ElectroMech\" \/>\n<meta property=\"og:description\" content=\"ElectroMech EOT cranes support renewable energy projects, enabling safe, precise handling of heavy components in wind, solar and hydro power plant environments.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"ElectroMech\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T06:32:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/thumbnail1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"358\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/case-study\\\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\\\/\",\"url\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/case-study\\\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\\\/\",\"name\":\"Gantry Cranes for Infrastructure Handling | ElectroMech\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/case-study\\\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/case-study\\\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/06\\\/thumbnail1-1.jpg\",\"datePublished\":\"2024-06-05T12:17:06+00:00\",\"dateModified\":\"2026-10-09T06:32:31+00:00\",\"description\":\"ElectroMech EOT cranes support renewable energy projects, enabling safe, precise handling of heavy components in wind, solar and hydro power plant environments.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/case-study\\\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/case-study\\\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/case-study\\\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\\\/#primaryimage\",\"url\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/06\\\/thumbnail1-1.jpg\",\"contentUrl\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/06\\\/thumbnail1-1.jpg\",\"width\":358,\"height\":200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/case-study\\\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Precast Sector\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/#website\",\"url\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/\",\"name\":\"India\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/in\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gantry Cranes for Infrastructure Handling | ElectroMech","description":"ElectroMech EOT cranes support renewable energy projects, enabling safe, precise handling of heavy components in wind, solar and hydro power plant environments.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Gantry Cranes for Infrastructure Handling | ElectroMech","og_description":"ElectroMech EOT cranes support renewable energy projects, enabling safe, precise handling of heavy components in wind, solar and hydro power plant environments.","og_url":"https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/","og_site_name":"ElectroMech","article_modified_time":"2026-10-09T06:32:31+00:00","og_image":[{"width":358,"height":200,"url":"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/thumbnail1-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/","url":"https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/","name":"Gantry Cranes for Infrastructure Handling | ElectroMech","isPartOf":{"@id":"https:\/\/electromech.staging2.amura.in\/in\/#website"},"primaryImageOfPage":{"@id":"https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/#primaryimage"},"image":{"@id":"https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/thumbnail1-1.jpg","datePublished":"2024-06-05T12:17:06+00:00","dateModified":"2026-10-09T06:32:31+00:00","description":"ElectroMech EOT cranes support renewable energy projects, enabling safe, precise handling of heavy components in wind, solar and hydro power plant environments.","breadcrumb":{"@id":"https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/#primaryimage","url":"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/thumbnail1-1.jpg","contentUrl":"https:\/\/electromech.staging2.amura.in\/in\/wp-content\/uploads\/sites\/2\/2026\/06\/thumbnail1-1.jpg","width":358,"height":200},{"@type":"BreadcrumbList","@id":"https:\/\/electromech.staging2.amura.in\/in\/case-study\/gantry-cranes-for-efficient-handling-of-infrastructure-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/electromech.staging2.amura.in\/in\/"},{"@type":"ListItem","position":2,"name":"Precast Sector"}]},{"@type":"WebSite","@id":"https:\/\/electromech.staging2.amura.in\/in\/#website","url":"https:\/\/electromech.staging2.amura.in\/in\/","name":"India","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/electromech.staging2.amura.in\/in\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/electromech.staging2.amura.in\/in\/wp-json\/wp\/v2\/case-study\/2413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/electromech.staging2.amura.in\/in\/wp-json\/wp\/v2\/case-study"}],"about":[{"href":"https:\/\/electromech.staging2.amura.in\/in\/wp-json\/wp\/v2\/types\/case-study"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/electromech.staging2.amura.in\/in\/wp-json\/wp\/v2\/media\/2441"}],"wp:attachment":[{"href":"https:\/\/electromech.staging2.amura.in\/in\/wp-json\/wp\/v2\/media?parent=2413"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/electromech.staging2.amura.in\/in\/wp-json\/wp\/v2\/categories?post=2413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}