{"id":2327,"date":"2026-06-08T09:05:34","date_gmt":"2026-06-08T09:05:34","guid":{"rendered":"https:\/\/electromech.staging2.amura.in\/id\/?post_type=case-study&#038;p=2327"},"modified":"2026-06-25T05:34:48","modified_gmt":"2026-06-25T05:34:48","slug":"power-sector","status":"publish","type":"case-study","link":"https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/","title":{"rendered":"Power Sector"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/electromech.staging2.amura.in\/id\/case-study\/double-girder-gantry-cranes-for-heavy-lifting-in-the-infrastructure-industry\" target=\"_blank\" rel=\"noreferrer noopener\"><\/a><\/p>\n\n\n\n<section class=\"wp-block-custom-case-study case-study\"><div class=\"case-study-banner-wrapper\"><div class=\"container\"><h1 class=\"case-study-banner__main-title\">EOT cranes for Nuclear Power Plants<\/h1><\/div><div class=\"case-study-banner\"><div class=\"container wrapper_banner\"><div class=\"case-study-banner__box\"><h2 class=\"case-study-banner__box-subtitle\">WE ARE YOUR SOLUTION<\/h2><div class=\"case-study-banner__box-desc\"><p>Indigenous Single Failure Proof cranes <br class=\"hidden-xs\">for Nuclear Power Plants<\/p><\/div><\/div><div class=\"case-study-banner__image\"><img decoding=\"async\" loading=\"lazy\" width=\"700\" height=\"341\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/image1.jpg\" alt=\"EOT cranes for Nuclear Power Plants\"\/><\/div><\/div><\/div><\/div><div class=\"case-study-overview-image\"><div class=\"container\"><img decoding=\"async\" loading=\"lazy\" width=\"1600\" height=\"827\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/patch-bg.png\" alt=\"\"\/><\/div><\/div><div class=\"case-study-overview\"><div class=\"overview-block has-bg\" style=\"background-color:#ebebeb\"><div class=\"container\"><h2>About Nuclear Power Corporation of India (NPCIL)<\/h2><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><p>NPCIL is a Public Sector Enterprise under the administrative control of the Department of Atomic Energy, Government of India. It was established in 1987 with the objective of implementing atomic power projects for generation of electricity. It is responsible for design, construction, commissioning and operation of nuclear power reactors in India. One such major project is the expansion of the Kakrapar Atomic Power Plant (KAPP) with two more units <\/p>\n<p>For the 3rd and 4th units of KAPP, NPCIL sought a competent and experienced crane manufacturer with the capability to design, manufacture and commission 29 EOT cranes according to the critical requirements of the project while being able to adhere to stringent quality norms.<\/p>\n<p>The cranes are to be operated at crucial locations in the reactor building, reactor auxiliary workshop and mechanical workshop of the nuclear power plant<\/p>\n<p>The scope of the work also included the designing of three critical Single Failure Proof cranes (SFPs).<\/p>\n<h3>ElectroMech recently supplied 29 EOT cranes to Nuclear Power Corporation of India (NPCIL) for their Kakrapar Atomic Power Project (KAPP) near Surat in Gujarat. This order includes 3 Single Failure Proof cranes (SFPs). <\/h3><\/div><\/div><\/div><\/div><div class=\"overview-block image-only has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><div class=\"overview-block__vertical\"><img decoding=\"async\" loading=\"lazy\" width=\"1600\" height=\"685\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/image3.jpg\" alt=\"\"\/><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><h2>Single Failure Proof crane (SFP)<\/h2><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><h3>What is it?<\/h3>\n<p>A Single Failure Proof crane has redundant systems and mechanisms built into it as a measure to prevent untoward incidents. This backup system ensures that the work cycle is completed in the remote possibility of one system or mechanism failing. In the case of these cranes, it means that if a load carrying system or mechanism suffers a failure, the full load is taken by the backup or redundant mechanism. This, in turn, prevents any major catastrophe in case of failure of any load carrying component in the system.<\/p>\n<h3>Why is this required?<\/h3>\n<p>These cranes operate in critical areas of the Nuclear Power plant \u2013 two at the top of the reactor building dome, directly above the nuclear reactor and one in the common Spent Fuel Storage Bay (SFSB) of the two units. These locations and nature of the load to be handled naturally demand a very high level of safety, necessitating the need for Single Failure Proof cranes.<\/p>\n<h3>How is this achieved?<\/h3>\n<p>ElectroMech has provided NPCIL with two types of Single\nFailure Proof cranes, each achieving the SFP criteria through a\ndifferent solution.<\/p>\n<p>In the 60t cranes, the required redundancy is achieved by using\ntwo independent load paths through two rope drums. Both the\nrope drums are driven by separate gearboxes and motors,\nsynchronised to ensure equal displacement of wire rope in each\nload path. Each load path is designed to hold the rated load. The\nrope paths are taken on alternate pulleys to maintain equilibrium\nof load in case of failure of one rope system. The hooks used are\nof dual design with dual attaching points, thereby if one attachment fails, the other load path continues to support the\nload.<\/p>\n<p>The 75t crane has a unique three hook arrangement to a yoke.\nThis includes a main hook of 75t and two 40t hooks on either\nside. They are positioned in such a way that the composite lifting\nassembly meets the requirement of single failure criteria.\nDuring regular operation, the load will be lifted by the 75t hook\nand in case of failure of this hook, the load will be borne by the\ntwo 40t hooks in order to ensure that there is no operational\nbreakdown.\n<\/p>\n<\/div><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ebebeb\"><div class=\"container\"><h2>Quality Assurance Plan delivering maximum satisfaction<\/h2><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><p>NPCIL and the quality team at ElectroMech worked rigorously and\nin close integration with each other to ensure that the cranes\nmeet the required safety parameters. A detailed Quality\nAssurance Plan (QAP) was devised to follow the quality standards\nstep by step at every stage of the crane development keeping in\nmind that zero error is achieved.<\/p>\n<p>The QAP followed a 5 stage process which can be elaborated as\nfollows:<\/p>\n<h3>Stage 1<\/h3>\n<p>Defining, drafting and finalising of the quality plan and procedures\nwith respect to the requirements of NPCIL, and obtaining the\napprovals on these procedures and schedules from NPCIL\u2019s\ndesign and quality team<\/p>\n<h3>Stage 2<\/h3>\n<p>Raw materials inspection (steel &amp; forgings) &#8211; A well documented\/\ndetailed material identification process was followed along with\nstamp transfers of materials from NPCIL for all the raw materials\nand components. The Non Destructive Examination (NDE) and\ntesting of all material and components were observed by the\nNPCIL team at NABL accredited labs.\n<\/p>\n<h3>Stage 3<\/h3>\n<p>Safety-critical and function-critical outsourced\/bought out components &#8211; Several tests were conducted for each component to verify it as per quality parameters. Some of these were:<\/p>\n<ul>\n          <li>Hooks &#8211; NPCIL observed raw material testing, NDE and proof load testing.<\/li>\n          <li>Wire Ropes &#8211; Breaking force testing<\/li>\n          <li>Gearbox &#8211; Rim testing, NDE and functional testing was conducted at the supplier\u2019s facility.<\/li>\n          <li>Control Panel &#8211; Functional testing was witnessed at the supplier\u2019s facility<\/li>\n          <li>Wheels &#8211; Forging rim testing and NDE<\/li>\n        <\/ul>\n<h3>Stage 4<\/h3>\n<p>Special component testing &#8211; Yoke\nand hook load and overload\ntesting was conducted by the\nElectroMech team in presence of\nNPCIL\u2019s quality and design team at\na special facility<\/p>\n<h3>Stage 5<\/h3>\n<p>Full crane functional testing for load and overload test was\nobserved by NPCIL at our plant for various conditions and\nparameters.\n<\/p><\/div><\/div><\/div><\/div><div class=\"overview-block image-only has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><div class=\"overview-block__vertical\"><img decoding=\"async\" loading=\"lazy\" width=\"1170\" height=\"535\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/handling.jpg\" alt=\"\"\/><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><h2>The handling challenges at NPCIL : Crane 1<\/h2><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><h3>Design<\/h3>\n<p>One of the biggest challenges while designing this crane was that the Single Failure Proof crane for the 700MW reactor was to be made with the same dimensional constraints as a regular EOT crane. Moreover, the span of the crane for the 700MW reactor is 21m as compared to 10m for a crane in the earlier 500MW reactors. This made the design and arrangement of the crane components a daunting task while meeting the dimensional <\/p>\n<h3>Seismic Design<\/h3>\n<p>Design to ensure structural integrity during a seismic event was called for. The crane structural needed to be designed for Safe Shutdown Earthquake (SSE) and Operating Base Earthquake (OBE) standards as per the furnished Floor Response Spectra.<\/p>\n<p>For the design and qualification of the plant the Safe Shutdown Earthquake (SSE) standard is adopted. In simple language, this means, in the eventuality of an earthquake it must be possible to shut down the plant and equipment safely. Similarly, the intensity of the Operating Base Earthquake (OBE) is related to the production period of the Nuclear Power Plant. After an OBE, it should be possible to shut down the plant safely and further operation of the plant and equipment should be possible after checking and a certain amount of repair work.<\/p>\n<p>The Floor Response Spectra is tabulated data that gives the acceleration forces that may act on the crane in the event of an earthquake. These acceleration values are a function of equipment frequency and the elevation (i.e. crane location) amongst many other factors. By using the data provided by NPCIL for the particular site location, the crane structure was suitably qualified.<\/p>\n<h3>Procurement, Quality and Production<\/h3>\n<p>The special design called for use of special\/non-standard materials. For example, MS plates of grade E350 instead of conventional grade E250 were used for girder fabrication, square tubes were used for trolley fabrication and caliper brakes were used, to mention a few. Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) were re-established to meet the customer requirement as per American Society of Mechanical Engineers (ASME).<\/p>\n<p>Above all, a stringent quality plan was followed in which material was tested to meet the highest quality standards at each stage of the production cycle &#8211; from raw material to finished component.<\/p><\/div><\/div><\/div><\/div><div class=\"overview-block image-only has-bg\" style=\"background-color:#ebebeb\"><div class=\"container\"><div class=\"overview-block__vertical\"><img decoding=\"async\" loading=\"lazy\" width=\"1170\" height=\"535\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/solution.jpg\" alt=\"\"\/><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ebebeb\"><div class=\"container\"><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><h3>Crane 1<\/h3>\n<p>This crane will be used mainly\nfor handling of Primary\nCoolant Pumps, which are\nlocated directly above the\nreactor. The secondary\napplication is for erection &amp;\nmaintenance related\nactivities of all the equipment\nwithin the reactor building.\n<\/p>\n<h3>Solution from ElectroMech: Crane 1<\/h3>\n<p>Our design team, along with the NPCIL design team, conceptualised a double-decked arrangement of the trolley mechanism. The design of this trolley with a height of approximately 6.5m and sitting on top of the reactor building was successfully undertaken by our design team. This new concept was endorsed by the NPCIL team, so much so that the same concept will be adopted in unit 7 of their Rajasthan Atomic Power Plant as well.<\/p>\n<h3>Seismic Design<\/h3>\n<p>The ElectroMech design was reviewed by the NPCIL design team and handed over to a third party for analysis using software to simulate more virtual conditions. Finally, after detailed engineering and analysis, the structural design was approved. This was tested for full load and overload in our factory before despatch in the presence of a specialist team from NPCIL, QS Pune team which inspected the cranes for assuring quality and NPCIL Mumbai team which provided support regarding the design inputs at several stages. Several tests were conducted by simulating even the rare possibilities and our cranes satisfactorily passed all of them<\/p><\/div><\/div><\/div><\/div><div class=\"overview-block image-only has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><div class=\"overview-block__vertical\"><img decoding=\"async\" loading=\"lazy\" width=\"1170\" height=\"567\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/table.jpg\" alt=\"\"\/><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><h3>Features<\/h3>\n<ul>\n                  <li>Indigenous design and manufacturing, vast experience and large manufacturing capability helped in shortening the procurement time and meet the project deadline <\/li>\n                  <li>Substantial saving in procurement cost due to completely indigenous manufacturing<\/li>\n                  <li>The innovative concept of 2-tier crab design ensured dimensional constraints which were met even when there was an increase in the crane span and capacity<\/li>\n                  <li>First of a kind, dual drive mechanism was introduced where the yoke was being handled with two individual brakes for two rope drums which helped achieve full operational control as the crane is in operable condition even if there is troubleshooting in one of the drives, whereas the earlier cranes had just a single drive, driving two rope drums<\/li>\n                  <li>Assured competent service through Cranedge, ElectroMech\u2019s service subsidiary<\/li>\n                <\/ul><\/div><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ebebeb\"><div class=\"container\"><h2>The handling challenges at NPCIL : Crane 2<\/h2><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><h3>Design Challenges<\/h3>\n<p>Designing a Single Failure Proof crane is always a challenging task. There were a few more additional constraints while designing this crane, such as its span being only 6.8m. This demanded the trolley including redundancy machinery, safety equipment like caliper brakes and auxiliary machinery to be tightly accommodated in a crab area of 6.5m X 5.5m.<\/p>\n<h3>Crane Application<\/h3>\n<p>This crane will be used to handle spent fuel rods in the Spent Fuel Storage Bay, where they will be stored in spent fuel pools. Spent fuel rods from the nuclear reactors are stored for 10 to 20 years in storage pools that are typically 40+ feet deep. These pools contain water, which acts as a shield to prevent radiation from entering the atmosphere as well as cools the fuel assemblies that continue to produce heat (called decay heat) for some time after removal. The bottom is equipped with storage racks designed to hold fuel assemblies. Used nuclear waste, in the form of tiny pellets, is loaded onto metal rods that are then bundled into a &#8216;fuel assembly&#8217;. The assemblies are stored inside casements that are then submerged in cooling pools. The application of the 75\/30t Single Failure Proof crane supplied by ElectroMech will be able to handle these casements. Needless to say, this is a very critical application, requiring the highest levels of safety, reliability and precision.<\/p>\n<\/div><\/div><\/div><\/div><div class=\"overview-block image-only has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><div class=\"overview-block__vertical\"><img decoding=\"async\" loading=\"lazy\" width=\"1170\" height=\"535\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/solution2.jpg\" alt=\"\"\/><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><h3>Crane 2<\/h3>\n<p>A Single Failure Proof crane for Spent Fuel Storage Bay (SFSB)\n        <br>As a part of this challenging project, we have completed the order for yet another Single Failure Proof crane (SFP) to be used in the Spent Fuel Storage Bay (SFSB).<\/p>\n<h3>Solution from ElectroMech: Crane 2<\/h3>\n<h3>Crane Construction<\/h3>\n<p>The crane lower block has been provided with three hooks &#8211; a 75t main hook and two 40t hooks on either side. They are positioned in such a way that the composite lifting assembly meets the requirement of single failure criteria. During regular operation, the load will be lifted by the 75t hook and in case of failure of this hook, the load will be borne by the two 40t hooks.<\/p>\n<p>This lower block gets engaged with a 3-pin arrangement to a specially designed yoke, which is a lifting attachment with four 25t hooks. This yoke will handle the spent fuel casements kept underwater.<\/p>\n<p>Stringent guidelines, right from the raw material to manufacturing and testing were specified by the customer considering the critical nature of the application. Some of the special requirements for the underwater application include galvanising the lower block and treating the yoke hooks with manganese phosphate, which is used for corrosion protection against the intensive underwater application. This coating treatment to the hooks enhances the overall life cycle making it durable in extreme conditions.<\/p>\n<\/div><\/div><\/div><\/div><div class=\"overview-block image-only has-bg\" style=\"background-color:#ebebeb\"><div class=\"container\"><div class=\"overview-block__vertical\"><div class=\"overview-images-grid items-3\"><div class=\"overview-image-item\"><img decoding=\"async\" loading=\"lazy\" width=\"570\" height=\"452\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/gallery1.jpg\" alt=\"\"\/><\/div><div class=\"overview-image-item\"><img decoding=\"async\" loading=\"lazy\" width=\"570\" height=\"452\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/gallery2.jpg\" alt=\"\"\/><\/div><div class=\"overview-image-item\"><img decoding=\"async\" loading=\"lazy\" width=\"570\" height=\"452\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/gallery3.jpg\" alt=\"\"\/><\/div><\/div><\/div><\/div><\/div><div class=\"overview-block image-only has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><div class=\"overview-block__vertical\"><img decoding=\"async\" loading=\"lazy\" width=\"1602\" height=\"830\" src=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/2\/2026\/06\/benefit.jpg\" alt=\"\"\/><\/div><\/div><\/div><div class=\"overview-block has-bg\" style=\"background-color:#ffffff\"><div class=\"container\"><h2>How NPCIL benefited from ElectroMech solutions<\/h2><div class=\"overview-block__vertical\"><div class=\"overview-block__text\"><ul>\n            <li>Indigenous design and manufacturing, vast experience and large manufacturing capability helped in shortening the procurement time and meet the project deadline <\/li>\n            <li>Substantial saving in procurement cost due to completely indigenous manufacturing<\/li>\n            <li>The innovative concept of 2-tier crab design ensured dimensional constraints which were met even when there was an increase in the crane span and capacity<\/li>\n            <li>First of a kind, dual drive mechanism was introduced where the yoke was being handled with two individual brakes for two rope drums which helped achieve full operational control as the crane is in operable condition even if there is troubleshooting in one of the drives, whereas the earlier cranes had just a single drive, driving two rope drums<\/li>\n            <li>Assured competent service through Cranedge, ElectroMech\u2019s service subsidiary<\/li>\n          <\/ul><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"featured_media":2452,"template":"","categories":[],"class_list":["post-2327","case-study","type-case-study","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Power Sector - Indonesia<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Power Sector - Indonesia\" \/>\n<meta property=\"og:url\" content=\"https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/\" \/>\n<meta property=\"og:site_name\" content=\"ElectroMech\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-25T05:34:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/3\/2026\/06\/NPCIL_banner.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"358\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/case-study\\\/power-sector\\\/\",\"url\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/case-study\\\/power-sector\\\/\",\"name\":\"Power Sector - Indonesia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/case-study\\\/power-sector\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/case-study\\\/power-sector\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2026\\\/06\\\/NPCIL_banner.jpg\",\"datePublished\":\"2026-06-08T09:05:34+00:00\",\"dateModified\":\"2026-06-25T05:34:48+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/case-study\\\/power-sector\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/case-study\\\/power-sector\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/case-study\\\/power-sector\\\/#primaryimage\",\"url\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2026\\\/06\\\/NPCIL_banner.jpg\",\"contentUrl\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2026\\\/06\\\/NPCIL_banner.jpg\",\"width\":358,\"height\":200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/case-study\\\/power-sector\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Power Sector\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/#website\",\"url\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/\",\"name\":\"Indonesia\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/electromech.staging2.amura.in\\\/id\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Power Sector - Indonesia","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Power Sector - Indonesia","og_url":"https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/","og_site_name":"ElectroMech","article_modified_time":"2026-06-25T05:34:48+00:00","og_image":[{"width":358,"height":200,"url":"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/3\/2026\/06\/NPCIL_banner.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/","url":"https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/","name":"Power Sector - Indonesia","isPartOf":{"@id":"https:\/\/electromech.staging2.amura.in\/id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/#primaryimage"},"image":{"@id":"https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/#primaryimage"},"thumbnailUrl":"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/3\/2026\/06\/NPCIL_banner.jpg","datePublished":"2026-06-08T09:05:34+00:00","dateModified":"2026-06-25T05:34:48+00:00","breadcrumb":{"@id":"https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/#primaryimage","url":"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/3\/2026\/06\/NPCIL_banner.jpg","contentUrl":"https:\/\/electromech.staging2.amura.in\/id\/wp-content\/uploads\/sites\/3\/2026\/06\/NPCIL_banner.jpg","width":358,"height":200},{"@type":"BreadcrumbList","@id":"https:\/\/electromech.staging2.amura.in\/id\/case-study\/power-sector\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/electromech.staging2.amura.in\/id\/"},{"@type":"ListItem","position":2,"name":"Power Sector"}]},{"@type":"WebSite","@id":"https:\/\/electromech.staging2.amura.in\/id\/#website","url":"https:\/\/electromech.staging2.amura.in\/id\/","name":"Indonesia","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/electromech.staging2.amura.in\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/electromech.staging2.amura.in\/id\/wp-json\/wp\/v2\/case-study\/2327","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/electromech.staging2.amura.in\/id\/wp-json\/wp\/v2\/case-study"}],"about":[{"href":"https:\/\/electromech.staging2.amura.in\/id\/wp-json\/wp\/v2\/types\/case-study"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/electromech.staging2.amura.in\/id\/wp-json\/wp\/v2\/media\/2452"}],"wp:attachment":[{"href":"https:\/\/electromech.staging2.amura.in\/id\/wp-json\/wp\/v2\/media?parent=2327"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/electromech.staging2.amura.in\/id\/wp-json\/wp\/v2\/categories?post=2327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}